Overview
SERC Regional Reliability Standards apply to the planning, operation, and critical infrastructure protection of the Bulk Power System in the SERC Region. Proposed SERC Regional Reliability Standards are subject to approval by NERC, as the electric reliability organization, and by FERC before becoming mandatory and enforceable under Section 215 of the FPA. No SERC Regional Reliability Standard is effective within the SERC area unless filed by NERC with FERC and approved by FERC.
The SERC Regional Reliability Standard Development Procedure has the following characteristics:
- Openness – Participation in the development of a SERC Regional Reliability Standard shall be open to all organizations that are directly and materially affected by the SERC bulk power system reliability.
- Balance – The SERC Regional Reliability Standards Development Procedure strives to have an appropriate balance of interests and shall not be dominated by any two interest categories and no single interest category shall be able to defeat a matter.
- Inclusive – Any entity (person, organization, company, government agency, individual, etc.) with a direct and material interest in the bulk power system in the SERC area shall have a right to participate.
- Fair due process – The SERC Regional Reliability Standards Development Procedure provides for reasonable notice and opportunity for public comment.
- Transparent – All actions material to the development of SERC Regional Reliability Standards shall be transparent.
- Due Course – Does not unnecessarily delay development of the proposed SERC Regional Reliability Standard.
|
Announcements |
|
Title |
Detail |
Date Posted |
|
SERC Underfrequency Load Shedding (UFLS) regional reliability standard (PRC-006-SERC-01) - Open |
Voting on the proposed SERC Regional UFLS Standard is now open for the period from November 13 through November 23, 2009. Link to: Ballot Pool Members
|
11/13/2009 |
|
Webinar on the Proposed SERC Underfrequency Load Shedding (UFLS) Standard
|
The recording of the Webinar on the Proposed SERC Underfrequency Load Shedding (UFLS) Standard that occurred on Monday, November 9, 2009 is now available. Click the link below to: Play Recording
The slides used in the Webinar are also now available for download: SERC UFLS Std Webinar Slides(11-09-09)
|
11/12/2009 |
|
Pre-Ballot Review Period for SERC UFLS Regional Standard: October 27-November 10, 2009 |
Draft 4 of the proposed SERC Underfrequency Load Shedding (UFLS) regional reliability standard (PRC-006-SERC-01) has been posted for a 15-day pre-ballot review period. The drafting team and the SERC Standards Committee have agreed that the standard is ready to be submitted to the SERC Registered Ballot Body for approval. The review period is from October 27 through November 10, 2009. Voting will begin shortly after the pre-ballot review closes. A separate notice with details on the ballot procedure will be issued to the Ballot Pool.
|
10/28/2009 |
|
SERC UFLS Ballot Pool Enrollment -Closed |
SERC Registered Ballot Body (RBB) members may join the ballot pool to be eligible to vote on the proposed SERC Under frequency Load Shedding (UFLS) regional reliability standard (PRC-006-SERC-01). |
10/2/2009 |
|
Draft 3a SERC UFLS Standard |
Draft 3a of SERC Underfrequency Load Shedding Standard Posted for Comments:Due October 15, 2009 |
9/15/2009 |
|
SERC Registered Ballot Body List |
The list of the members of the SERC Registered Ballot Body (RBB) is now posted on the SERC website |
|